Ad details
The quantity of concrete to pour depends on the size of the bridge. For a 17.80 m weighbridge, approximately 13 m3 of concrete dosed at 320 kg/m3 are required.
General information
KAMPALA DISTRICT
Posted Ad
Share this ad
Ad statistics
Number of views : 18
Last visited on : 05/10 at 08:27
Reference : 108502